Meta at Spring District (former REI Headquarters)
A roughly 400,000-square-foot office campus built for REI's headquarters but sold unused to Facebook (Meta) in 2020.
This eight-acre, roughly 400,000-square-foot office campus in Bellevue's Spring District was developed as the new headquarters for outdoor co-op REI. Designed around a connected, outdoors-inspired campus with landscaped courtyards by GGN, it was nearly complete when the COVID-19 pandemic upended REI's plans.
Rather than occupy the brand-new campus, REI sold it in September 2020 to Facebook (now Meta) for approximately $390 million, part of the social media company's rapid expansion across the Seattle area. REI instead distributed its headquarters functions across multiple smaller sites.
The campus anchors the western edge of the Spring District, a 36-acre, transit-oriented mixed-use neighborhood served by the Spring District/120th light rail station, and stands as a prominent example of the tech industry's reshaping of the Bel-Red corridor.
More in Bel-Red
See all →Bellevue 600
Downtown
Amazon's 43-story, 600-foot Downtown Bellevue office tower, the company's tallest, adjacent to the Bellevue Downtown light rail station.
- Height
- 600 ft
- Floors
- 43
- Topped out
- September 2024
Onni 606
Downtown
A three-tower, ~600-ft mixed-use complex under construction on the old Barnes & Noble block — billed as the largest construction project in Washington State.
- Towers
- 3
- Max height
- ≈600 ft
- Residences
- 1,289
Sonic (555 Tower)
Downtown
A 600-foot, 42-story Vulcan-built office tower opened in 2023, leased to Amazon and known as Sonic, tying for tallest in Bellevue.
- Height
- 600 ft
- Floors
- 42
- Completed
- 2023
Bellevue Towers
Downtown
Twin 42- and 43-story condo towers at 450 feet, completed in 2009, the largest LEED Gold residential development in the Pacific Northwest.
- Height
- ~450 ft
- Floors
- 42 & 43
- Units
- 539