Office towers · Downtown
The Summit
A pair of mid-rise Class A office towers completed in 2002, Summit I and Summit II total over 500,000 square feet downtown.
The Summit is a downtown Bellevue office complex comprising two LMN-designed towers: Summit I at 355 110th Avenue NE and Summit II at 10885 NE 4th Street, completed in 2002. Summit I rises 11 stories and Summit II 13 stories, together totaling roughly 524,000 square feet of Class A office space.
The complex was master-planned to include a third phase, Summit III, a fully entitled development site approved for an additional 330,000-plus square feet of office space adjacent to the existing buildings.
Located near the Bellevue Transit Center and light rail, the Summit towers are part of the cluster of early-2000s office buildings that thickened downtown Bellevue's skyline.
More in Downtown
See all →400 Lincoln Square
Downtown
The 31-story office tower of Kemper's $1.2 billion Lincoln Square South expansion, home to top tech and game companies.
- Height
- 449 ft
- Floors
- 31
- Completed
- 2017
888 Bellevue
Downtown
A pair of 18- and 23-story apartment towers on 108th Ave NE with hotel-like amenities, completed in 2020.
- Floors
- 18 & 23
- Units
- ~400-418
- Completed
- 2020
929 Office Tower
Downtown
A 19-story 2015 LMN-designed tower, among the first in the world with interactive 'smart' tenant controls.
- Height
- 250 ft
- Floors
- 19
- Completed
- 2015
989 Elements
Downtown
A residential high-rise complex in the Ashwood District; its 989 Elements tower was Bellevue's first rental apartment high-rise.
- Height
- ~288 ft (88 m)
- Floors
- 26
- Completed
- 2006