Pedestrian bridge / corridor · Downtown

Grand Connection Crossing

A planned pedestrian and bike bridge over I-405 linking downtown Bellevue's City Hall plaza to Eastrail in Wilburton.

~30-40 ft
Width
~2030
Target opening

The Grand Connection is Bellevue's signature initiative to create a continuous pedestrian and bicycle corridor stretching from Meydenbauer Bay on Lake Washington through downtown to the Eastrail trail in Wilburton. Its keystone element, the Grand Connection Crossing, is a planned bridge over Interstate 405 connecting the Bellevue City Hall plaza near the Downtown light rail station to Eastrail.

Designs call for a structure roughly 30 feet wide at the City Hall plaza, widening to about 40 feet over the freeway. The city has estimated the crossing at $175-230 million for design, property, and construction, with early concept work funded by Amazon and a multi-tiered funding strategy under development.

Bellevue is pursuing the project under the General Contractor/Construction Manager delivery method, with initial connectivity from City Hall plaza to Eastrail anticipated to open around 2030. A lid-park alternative would add roughly 200,000 square feet of green and plaza space over the freeway between NE 4th and NE 6th streets.

Sources

More in Downtown

See all →

Light rail line

2 Line (East Link Light Rail)

Downtown

Sound Transit's 33-mile light rail line linking Seattle to the Eastside, with eight stations in and near Bellevue.

Length
33 miles
Operator
Sound Transit
Bellevue stations
6
Art museum

Bellevue Arts Museum

3 fl

Downtown

Steven Holl-designed art, craft and design museum in downtown Bellevue, a landmark of the city's pedestrian corridor.

Type
Art, craft and design museum
Building opened
2001
Architect
Steven Holl
Government building

Bellevue City Hall

9 fl

Downtown

Bellevue's nine-story city hall, a former telephone-company building reopened as municipal headquarters in 2006.

Type
City hall / government
Building completed
1983 (as Pacific NW Bell)
City reopened as City Hall
2006
Light rail station

Bellevue Downtown Station

Downtown

The 2 Line's downtown station in a retained cut beside Bellevue City Hall, at the east end of a tunnel under the city.

Opened
April 27, 2024
Line
2 Line
Type
Retained cut